Case study · EasyRentals · 2025 — present
prior team, an estimated $1.25M spent, nothing production-ready
to a production-ready, audit-ready ERP
specification documents governing the agents
sole architect directing the agents
Problem
I wrote the specification and designed the system. A separate team spent 2.5 years and an estimated $1.25M and never shipped. The rental operation ran on a command-line system later wrapped in Java Swing. New staff took too long to train. Oracle and Windows Server were expensive and brittle. Orders from the store still had to be typed in again.
Approach
I designed the replacement and directed the build. I did not write the code. The platform covered assets, orders, warehouse transfers, vendors, and a multi-tenant setup on AWS, with the storefront writing orders itself.
Result
A production-ready enterprise ERP in 20 weeks, built to support ISO 28000 and ISO 27001 audits, covering rental asset management, scheduling, supply chain, logistics, and multi-tenant infrastructure.
EasyRAM has been production-ready since March 2026. I co-founded EasyRentals. The rental operator that commissioned it has not cut over.
01
02
03
04
Under the hood
Laravel 12
React 19
TypeScript
PHP
Node.js
PostgreSQL
Docker
AWS
GS1 CBV state machines (ISO/IEC 19988)
ISO 28000/27001 audit trail
Digital Twin: 5-level spatial mapping
In-house LLM-free RAG
MCP consent gates
EMMA RAPP · TECHNICAL PROJECT MANAGER